
LBTH Rapid Charger Project - Second Round Sites
Phases
Consultation
Tower Hamlets Council is looking to further expand its electric vehicle-charging network to further support the adoption of low emission electric vehicles and reduce air pollution across the borough. The Council is proposing to install 12 new rapid (50kw-200kw) electric vehicle charge points across the borough which will charge a standard electric vehicle in 30 minutes to an hour.

Proposed rapid charger supplied and managed by Believ
This consultation
Tower Hamlets Council is carrying out a statutory consultation as required by Section 17 the London Local Authorities and Transport for London Act (2013) to install rapid chargers points at the locations below (click the link for each location below for the consultation leaflet). The chargers will located to ensure as many residents and businesses are as close as possible to a rapid charger and are also determined by the suitability of the on-street space.
This consultations
We are proposing new rapid chargers at each of the locations below. Click on a location to download a consultation letter containing more information.
What happens next?
Following the completion of the statutory consultation period (28 days) and thorough consideration of all representations, should the Council grant approval for installation, the Charge Point Operator (Believ) will install and maintain the charge point which will increase opportunities for on-street electric vehicle charging in your area.
